New Gas Pipeline Tanjung Kidurong Power Station, Bintulu
800 M Gas Pipeline, API 5L X 52 PSL 2
Completed with 50,000 Man-hour



OCIM Nitrogen Gas Plant for Air Liquide Malaysia
Installation of a complete Nitrogen Gas generation plant.
Fabrication and Installation of all piping system within the N2 plant, including Cryogenic Pipe.


Repair and Grouting of Conductor BE-14
BEDP-A Platform (Betty Field)
Tanjung Offshore Services Sdn. Bhd
Repair one of the corroded conductors on BEDP-A platform
Supply, Fabrication and Installation of all reinforcement and grout system

HDPE Water Pipeline Project
Kidurong Power Station, Bintulu Sarawak Energy Bhd
Supply, installation and commissioning of new water supply pipeline 2,400 m
Mobilization & demobilization of manpower, equipment and material